House Of Engineers, Inc
  • Home
    • Company Profile
    • Structural Engineering
    • Professional Engineering
    • Who We Are
  • Services
    • Healthcare
    • Commercial
    • Seismic Retrofit
    • Residential
  • About Us
    • Principals
    • Our Team
    • Mission Statement
  • Blog
  • Projects
  • Contact Us
Select Page
Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals

Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals

by houseoe | Jul 4, 2020 | Structural Performance

Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals SPC 1 Buildings posing significant risk of collapse and danger to the general public. Buildings are placed under this category if collapse probability...
Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals

Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals

by houseoe | Jul 4, 2020 | None-Structural Performance

Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals NPC 1 Buildings posing significant risk of the non-structural components in their structure. Buildings with equipment and systems not meeting the bracing...
CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?

CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?

by houseoe | Feb 23, 2020 | Building Codes

CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN? The 2019 California Building Code (2019 CBC), which is based on the 2018 International Building Code (2018 IBC), is going to be adopted in the State of California effective January 1, 2020. With...
How can non-ductile reinforced concrete buildings be retrofitted?

How can non-ductile reinforced concrete buildings be retrofitted?

by houseoe | Feb 17, 2020 | Retrofitting Techniques

How can non-ductile reinforced concrete buildings be retrofitted? Retrofitting non-ductile concrete buildings can be quite disruptive and involve technical structural engineering work. Solutions of retrofit may include concrete shear walls, steel braced frames, and...
How can wood-frame soft-story buildings be retrofitted?

How can wood-frame soft-story buildings be retrofitted?

by houseoe | Feb 17, 2020 | Retrofitting Techniques

How can wood-frame soft-story buildings be retrofitted? Retrofitting techniques come in a wide variety of forms, including the addition of light-frame wood shear walls or steel moment-resisting frames as required to eliminate the soft or weak story. Some ordinances...
Next Entries »
  • A Guide to Adaptive Reuse Engineering Projects
    A Guide to Adaptive Reuse Engineering Projects
  • Building Retrofits That Protect Value and Safety
    Building Retrofits That Protect Value and Safety
  • OSHPD 1 Plan Review Support for Healthcare Facilities
    OSHPD 1 Plan Review Support for Healthcare Facilities
  • Moment Frames Versus Shear Walls Compared
    Moment Frames Versus Shear Walls Compared
  • HCAI Classification Alignment for OSHPD 1, 1R, 2-5
    HCAI Classification Alignment for OSHPD 1, 1R, 2-5
  • HCAI Deferred Submittals: Avoid Approval Delays
    HCAI Deferred Submittals: Avoid Approval Delays
  • OSHPD 1 Hospital Construction in Orange County and LA
    OSHPD 1 Hospital Construction in Orange County and LA
  • Hotel Structural Engineering That Builds Confidence
    Hotel Structural Engineering That Builds Confidence
  • Why Buildings Require Retrofits for Safety
    Why Buildings Require Retrofits for Safety
  • What a Structural Permit Consultant Does
    What a Structural Permit Consultant Does
House of Engineers, Inc. | All Rights Reserved | Designed by PCE