House Of Engineers, Inc
  • Home
    • Company Profile
    • Structural Engineering
    • Professional Engineering
    • Who We Are
  • Services
    • Healthcare
    • Commercial
    • Seismic Retrofit
    • Residential
  • About Us
    • Principals
    • Our Team
    • Mission Statement
  • Blog
  • Projects
  • Contact Us
Select Page
How can non-ductile reinforced concrete buildings be retrofitted?

How can non-ductile reinforced concrete buildings be retrofitted?

by houseoe | Feb 17, 2020 | Retrofitting Techniques

How can non-ductile reinforced concrete buildings be retrofitted? Retrofitting non-ductile concrete buildings can be quite disruptive and involve technical structural engineering work. Solutions of retrofit may include concrete shear walls, steel braced frames, and...
How can wood-frame soft-story buildings be retrofitted?

How can wood-frame soft-story buildings be retrofitted?

by houseoe | Feb 17, 2020 | Retrofitting Techniques

How can wood-frame soft-story buildings be retrofitted? Retrofitting techniques come in a wide variety of forms, including the addition of light-frame wood shear walls or steel moment-resisting frames as required to eliminate the soft or weak story. Some ordinances...
  • A Guide to Adaptive Reuse Engineering Projects
    A Guide to Adaptive Reuse Engineering Projects
  • Building Retrofits That Protect Value and Safety
    Building Retrofits That Protect Value and Safety
  • OSHPD 1 Plan Review Support for Healthcare Facilities
    OSHPD 1 Plan Review Support for Healthcare Facilities
  • Moment Frames Versus Shear Walls Compared
    Moment Frames Versus Shear Walls Compared
  • HCAI Classification Alignment for OSHPD 1, 1R, 2-5
    HCAI Classification Alignment for OSHPD 1, 1R, 2-5
  • HCAI Deferred Submittals: Avoid Approval Delays
    HCAI Deferred Submittals: Avoid Approval Delays
  • OSHPD 1 Hospital Construction in Orange County and LA
    OSHPD 1 Hospital Construction in Orange County and LA
  • Hotel Structural Engineering That Builds Confidence
    Hotel Structural Engineering That Builds Confidence
  • Why Buildings Require Retrofits for Safety
    Why Buildings Require Retrofits for Safety
  • What a Structural Permit Consultant Does
    What a Structural Permit Consultant Does
House of Engineers, Inc. | All Rights Reserved | Designed by PCE