How can non-ductile reinforced concrete buildings be retrofitted?

Retrofitting non-ductile concrete buildings can be quite disruptive and involve technical structural engineering work. Solutions of retrofit may include concrete shear walls, steel braced frames, and other structural lateral vertical resisting systems that can be used. It is recommended that the owner to discuss his options with our structural engineers to select the most economical and practical solution for his structure.

How can non-ductile reinforced concrete buildings be retrofitted