Our Blog
Structural Engineering Insights, Seismic Design & Construction Resources
Expert Structural Engineering Articles from House of Engineers, Inc.
Welcome to the House of Engineers, Inc. Engineering Blog, your resource for professional insights, industry knowledge, and practical guidance on structural engineering, seismic retrofitting, building safety, and construction design throughout California.
Based in Irvine, Orange County, California, House of Engineers, Inc. provides professional structural engineering and consulting services for healthcare facilities, educational institutions, commercial buildings, industrial developments, multifamily properties, and residential construction projects.
Our blog is designed to help property owners, architects, contractors, developers, healthcare administrators, and construction professionals better understand the engineering principles, building codes, design requirements, and construction challenges that influence modern building projects.
Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals
Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All HospitalsBuildings posing significant risk of collapse and danger to the general public. Buildings are placed under this category if collapse probability assessment was...
Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals
Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All HospitalsBuildings posing significant risk of the non-structural components in their structure. Buildings with equipment and systems not meeting the bracing and...
CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?
CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?
How can non-ductile reinforced concrete buildings be retrofitted?
How can non-ductile reinforced concrete buildings be retrofitted?
How can wood-frame soft-story buildings be retrofitted?
How can wood-frame soft-story buildings be retrofitted?

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110




