Our Blog
Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All Hospitals
Non-Structural Performance Categories (SPC) Ratings By OSHPD Standards & What Does it Means To All HospitalsBuildings posing significant risk of the non-structural components in their structure. Buildings with equipment and systems not meeting the bracing and...
CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?
CHANGES IN BUILDING CODES TO CBC 2019 FROM CBC 2016, WHAT DOES THAT MEAN?
How can non-ductile reinforced concrete buildings be retrofitted?
How can non-ductile reinforced concrete buildings be retrofitted?
How can wood-frame soft-story buildings be retrofitted?
How can wood-frame soft-story buildings be retrofitted?

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110



