Top Causes of Structural Rework on Projects

Top Causes of Structural Rework on Projects

A relocated beam, an unverified concrete wall, or a mechanical opening added after steel is fabricated can change far more than one detail. The top causes of structural rework are usually coordination and information failures that surface in the field, where every...
DSA Submittal Process for School Projects

DSA Submittal Process for School Projects

A school project can be fully funded, architecturally resolved, and ready for bid on paper, yet still lose valuable time when its approval package reaches the Division of the State Architect with gaps between drawings, specifications, calculations, or scope. The DSA...
Top 10 OSHPD 1 Compliance Mistakes in Hospital Projects

Top 10 OSHPD 1 Compliance Mistakes in Hospital Projects

A hospital project can be structurally sound, architecturally complete, and still lose critical time because its documentation, installation sequence, or special inspection path does not satisfy the authority having jurisdiction. The Top 10 OSHPD 1 Compliance Mistakes...
What Is OSHPD 1? California Hospital Requirements

What Is OSHPD 1? California Hospital Requirements

A hospital renovation can appear straightforward on a floor plan, then become a highly regulated project once it affects patient care, life-safety systems, structural elements, or essential equipment. What Is OSHPD 1? A Complete Guide to California Hospital...
What Triggers Seismic Retrofit Requirements?

What Triggers Seismic Retrofit Requirements?

A seismic retrofit is not always triggered by a single failed inspection or a visible crack after an earthquake. For California owners, the answer to what triggers seismic retrofit requirements usually lies in the intersection of local ordinances, building permits, a...
How to Select Lateral Systems for California Buildings

How to Select Lateral Systems for California Buildings

A lateral system is not a detail to settle after the floor plans are complete. It shapes the building’s layout, usable area, foundation scope, permitting path, structural cost, and behavior in an earthquake. Knowing how to select lateral systems early gives owners,...