USC Arcadia Hospital

Two Story Office - Warm Shell Building

Location

Arcadia, CA

Owner

USC ARCADIA Hospital

Architect

Sautter Architecture

Contractor

Castle Construction Services Inc.

Services/Project Type

Structural Engineering
Seismic Design

This project consists of assisting the client in replacement of the operation lighting structure in operation room #10 and overhead ceiling supporting structure at the second floor of this facility to meet requirements set by The Office of Statewide Health Planning and Development (OSHPD).

The project involved working in the operation room space. The upgrade involved architectural, electrical components, and structural work that needed to be evaluated. This project is approved by HCAI and construction is now complete.

House of Engineers Inc provided the structural engineering design in support of achieving the remodel goals and reviewing architectural drawings and details to meet HCAI standards.This structure is designed using the California building code coupled with ASCE 7-16 for non-structural component design and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110