USC Arcadia Hospital
Location
Arcadia, CA
Owner
USC ARCADIA Hospital
Architect
Sautter Architecture
Contractor
Castle Construction Services Inc.
Services/Project Type
Structural Engineering
Seismic Design
The project involved working in the operation room space. The upgrade involved architectural, electrical components, and structural work that needed to be evaluated. This project is approved by HCAI and construction is now complete.
House of Engineers Inc provided the structural engineering design in support of achieving the remodel goals and reviewing architectural drawings and details to meet HCAI standards.This structure is designed using the California building code coupled with ASCE 7-16 for non-structural component design and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110