University California Los Angeles (UCLA) & School Districts
Location
Los Angeles & Various Locations, CA
Owner
Los Angeles Community College District
Architect
Jacobs Engineering
Contractor
MOBILE CARRIER (VERIZON, AT&T, T-MOBILE & SPRINT)
Services/Project Type
Structural Engineering
Seismic Design
This project is one of the many projects that is dedicated to the installation of antenna platforms for various carriers, AT&T, Verizon, and T-mobile & Sprint. This project was to boost G5 coverage all over Los Angles (UCLA) and other California locations. The UCLA is currently seeking to replace all existing 4G antennas with 5G throughout the campus. This project will be reviewed by DSA for approval. This retrofit and remodel project will be located in the city of Los Angeles California. This project was awarded to HoE due to the extensive experience in such structures.
House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using steel construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110