Two-Story Manufacturing Structure – DHS BUSINESS PARK
Two Story Office - Warm Shell Building

Location

Desert Hot Springs, CA

Owner

DHS Development

Architect

SYNARC STUDIO

Contractor

TBD

Services/Project Type

Structural Engineering
Seismic Design

This project consists of new construction for two-story structure. This structure consists of approximately 40,000 sqft two levels manufacturing and office building in the Desert Hot Springs California area. Second level is a composite floor with steel beams/trusses and the roof framing consists of steel beams with a metal deck system. This structure will offer the client a large space for manufacturing purposes to their the potential tenants and local business office spaces in the area. The lateral resisting system is made of Steel Ordinary Moment Frames for both levels and act as the vertical lateral resisting system; the second level will consist of composite floor metal deck as the horizontal rigid diaphragm lateral resisting system and the roof level will also consist of a metal deck distributing lateral forces to the designated vertical lateral resisting systems at this level.

House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using steel construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110