Sunny Express
Car Wash
Car Wash
Location
Hemet, Florida Street, & Lake Elsinore, CA
Owner
Sunny Express Car Wash Inc.
Architect
Synarc Studio
Contractor
TBD
Services/Project Type
Structural Engineering
Seismic Design
The proposed project consists of one building, and Vacuum Stations. The building consists of one story retail with approximate area of 5,000 sqft. This retail store will be built in the cities of Hemet, Florida Street, & Lake Elsinore California. This client request the design of three car wash structures with similar layout.
House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using steel construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110