Mission Hospital Regional Medical Center

Location

San Jose, CA

Owner

Mission Hospital Regional Medical Center

Architect

Jacobs Inc

Contractor

Jacobs Inc

Services/Project Type

Structural Engineering
Seismic Design

This project consists of assisting the client in upgrading the Non-Structural Performance Category of this facility to level 3 (NPC 3) to meet the requirements set by The Office of Statewide Health Planning and Development (OSHPD). The project involved working in the pharmaceutical spaces and clinical laboratory services spaces. The upgrade involved architectural, MEP and structural work that needed to be evaluated. This project is submitted to OSHPD for permit approval and plan check review.

House of Engineers Inc is providing the structural engineering design in support of achieving NPC 3 and reviewing architectural and MEP drawings and details to meet OSHPD standards. This structure is designed using the California building code coupled with ASCE 7-16 for non-structural component design and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110