LEGOLAND Discovery Center
Location
San Jose, CA
Owner
MINILEGOLAND
Architect
Studio 41b
Contractor
Studio 41b Construction Inc
Services/Project Type
Structural Engineering
Seismic Design
This project consists of new construction for four platforms anchorage to an existing concrete slab on grade. These four platforms represent four major landmarks of downtown San Francisco: Center San Francisco, Golden Gate, East Bay, and South Bay. These mini structures will be put inside of the existing mini LEGOLAND in San Jose California. This structure will offer the visitors a Lego version model of downtown San Francisco.
House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using steel and wood construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110