LAHC Marquee Sign Modernization
LAHC-Marquee-Sign-ModernizationLAHC-Marquee-Sign-Modernization

Location

Harbor College, Los Angeles CA

Owner

Los Angeles Community College District

Architect

Pacific Rim Architects

Contractor

TBD

Services/Project Type

Structural Engineering
Seismic Design

This project is located on the campus of Harbor Community College. The campus is seeking to replace the existing LED screens on campus with new and more modern looking screens throughout the campus. This project will be reviewed by DSA for approval. This retrofit and remodel project will be located in the city of Wilmington California. This project was won through a public bid by which this design team scored the highest and thus awarded this project.

House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis.This structure is designed using steel construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110