Brookhurst Point Meical Plaza

Location

Huntington Beach, CA

Owner

Harbor Circle, LLC

Architect

Archissance Inc

Contractor

Archissance Inc

Services/Project Type

Structural Engineering
Seismic Design

This project consists of new construction of 7,600 sqft. of Medical Office Building in the Huntigton Beach area. This Structure will offer the client the flexibility to divide the space per the tenant’s needs with interior partitions designed after the structure is built. Wood light frame material is what is used in for the structure. 

House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using timber construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110