Brookhurst Point Meical Plaza
Location
Huntington Beach, CA
Owner
Harbor Circle, LLC
Architect
Archissance Inc
Contractor
Archissance Inc
Services/Project Type
Structural Engineering
Seismic Design
This project consists of new construction of 7,600 sqft. of Medical Office Building in the Huntigton Beach area. This Structure will offer the client the flexibility to divide the space per the tenant’s needs with interior partitions designed after the structure is built. Wood light frame material is what is used in for the structure.
House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using timber construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers, Inc.
9070 Irvine Center Dr. # 200
Irvine CA 92618, US
(949) 767 - 0110