Taco Bell Hospitality

Location

San Bernardino, CA

Owner

Taco Bell Hospitality

Architect

Tait & Associates

Contractor

Taco Bell Hospitality

Services/Project Type

Structural Engineering
Seismic Design

The proposed project consists of one building, and trash enclosure. The building consists of one story retail store with approximate area of 2,240 sqft. This retail store will be built in the city of San Bernardino California. Taco Bell typically uses a prototype structure that is distributed to architects and engineers to follow.

House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using wood construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

House of Engineers Inc Logo

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110