LEGOLAND Discovery Center

Lego Land Discovery Center

Location

San Jose, CA

Owner

MINILEGOLAND

Architect

Studio 41b

Contractor

Studio 41b Construction Inc

Services/Project Type

Structural Engineering
Seismic Design

This project consists of new construction for four platforms anchorage to an existing concrete slab on grade. These four platforms represent four major landmarks of downtown San Francisco: Center San Francisco, Golden Gate, East Bay, and South Bay. These mini structures will be put inside of the existing mini LEGOLAND in San Jose California. This structure will offer the visitors a Lego version model of downtown San Francisco.

House of Engineers Inc is providing the structural engineering design which incorporates the latest design provisions for seismic design and analysis. This structure is designed using steel and wood construction and it is fully designed and detailed by our team of licensed structural engineers in the state of California.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110