About Us

Mr. Yazen H. Rabadi

House of Engineers, Inc.

Principal

Yazen H. Rabadi has joined House of Engineers in 2019 as a principle of the firm. Mr. Rabadi is a licensed California Structural Engineer with over 12 years of structural engineering experience in building analysis and design, including hospitals, industrial buildings, government buildings, office buildings, parking garages, schools, and theme parks.

 For his entire career, Yazen has provided structural engineering consulting services both internationally and locally.

Yazen served three years as a Senior Project Engineer working with an International consulting group in Dubai, UAE providing post tensioning structural design for future structures in the Middle East, Europe, and India.

Yazen has also provided structural engineering design services to public agencies including verity of school districts in the Texas area. Locally (State of California), Yazen continues to provide structural engineering and design services in buildings including hospitals (OSHPD), local municipalities including counties and cities, as well as universities and educational institutions.

His technical expertise includes structural steel and light-gage steel design, reinforced concrete design (including post-tensioned concrete), masonry design and wood design. He has extensive knowledge of various building codes including California Building Code for OSHPD and DSA projects.

retrofit-structural-engineering-california

House of Engineers, Inc.

9070 Irvine Center Dr. # 200
Irvine CA 92618, US

(949) 767 - 0110